Novotel Hotel, Dammam Saudi
Consist of Demolition and Dismantling Works, Concrete Work: Lean Concrete, Reinforced Concrete Water Tank (Below basement), Reinforced Concrete Service Stair Structure, Reinforced Concrete Elevator Shaft Structure, Masonry Work: Concrete Hollow Blocks, Siporex Blocks, Thermal & Moisture Protection: Water Proofing System (Wet Areas), Water Tank Tanking System, Finishing works: Concrete Screed (Plain & Reinforced), Ceramic Floor Tiles, Sand Cement Plaster, Vitonite Plaster for Siporex Blocks, Painting (Non-Decorative), Ceramic Wall Tiles, Granite Cladding (Elevator Wall), Gypsum Board Ceiling, Specialties: Toilet and Bath Accessories, Sanitary Fixtures and Mechanical (Plumbing & Fire Protection): Sweet and Raw Water (Pumped) System, Forced (Pumped) Sewer System, Plumbing Fixtures, Fire Sprinkler System, Fire Hose Cabinets and Portable Fire Extinguishers, Related Rough-ins, Civil and Builder's Work